International references
Tunneling
DUBAI (UAE)
Project: DEEP TUNNEL STORMWATER SYSTEM (DTSS)
Type of infrastructure: STORMWATER SYSTEM
Client: UNIMIX LLC / PORR – BESIX JV
Duration of assignment: Approximately 1 month
OSLO (NORWAY)
Project: FOLLO LINE PROJECT
Type of infrastructure: 37 km ROAD TUNNEL
Client: ACCIONA – GHELLA JV
Duration of assignment: Approximately 1 month
ISMAILIA / PORT SAID (EGYPT)
Project: ROAD TUNNELS UNDER THE SUEZ CANAL
Type of infrastructure: 5 km ROAD TUNNELS
Client: HERRENKNECHT, ORASCOM, PETROJET
Duration of assignment: Approximately 12 months
Bridges and viaducts
CEBU (PHILIPPINES)
Project: CEBU LINK EXPRESSWAY
Type of infrastructure: VIADUCT AND STAY CABLES BRIDGE
Client: ACCIONA INFRAESTRUCTURAS
Duration of assignment: Ongoing
FREDRIKSSUND (DENMARK)
Project: DUAL CARRIAGEWAY MARBÆKVEJ-SKIBBYVEJ
Type of infrastructure: VIADUCT
Client: BESIX-ACCIONA-RIZZANI DE ECCHER JV
Duration of assignment: Approximately 12 months
DUBAI (UAE)
Project: EXPOLINK 2020
Type of infrastructure: VIADUCTS
Client: ACCIONA-RIZZANI DE ECCHER JV
Duration of assignment: Approximately 12 months
CARTAGENA (COLOMBIA)
Project: VIADOTTO GRAN MANGLAR
Type of infrastructure: VIADUCT
Client: RIZZANI DE ECCHER
Duration of assignment: Approximately 12 months
Airports
TREVISO (ITALY)
Project: CANOVA INTERNATIONAL AIRPORT
Type of infrastructure: RUNWAYS
Client: CIVIL COURT OF TREVISO (ITALY)
Duration of assignment: Ongoing
DOHA (QATAR)
Project: AL SHAMAL MILITARY AIRPORT
Type of infrastructure: RUNWAYS / TAXIWAYS
Client: TCE ltd
Duration of assignment: 15 days
DOHA (QATAR)
Project: DOHA INTERNATIONAL AIRPORT
Type of infrastructure: TAXIWAYS
Client: QATAR AIRWAYS
Duration of assignment: Approximately 12 months
Engineering geology
ROGUN (TAJIKISTAN)
Project: ROGUN DAM HPP
Client: SALINI IMPREGILO
Duration of assignment: Approximately 12 months
MURMANSK (RUSSIA)
Project: ARTIC LNG2
Client: SAIPEM – SAREN
Duration of assignment: Approximately 3 months
Hydroelectric projects
ROGUN (TAJIKISTAN)
Project: ROGUN HPP
Type of infrastructure: RCC dam
Client: SALINI IMPREGILO
Duration of assignment: Approximately 3 months
ULU JELAI (MALAYSIA)
Project: ULU JELAI HYDROELECTRIC PROJECT
Type of infrastructure: GRAVITY DAM
Client: SALINI IMPREGILO
Duration of assignment: Approximately 3 months
Maritime structures
DUQM (OMAN)
Project: NEW LIQUID BERTH PROJECT
Type of infrastructure: BULK LIQUID GAS TERMINAL
Client: BESIX / BOSKALIS WESTMISTER
Duration of assignment: Approximately 6 months
Nuclear power plants
PORTISHEAD (ENGLAND)
Project: HINKLEY POINT C
Type of infrastructure: NEW NUCLEAR POWER PLANT
Client: EDF (Electricitè de France) / Balfour Beatty
Duration of assignment: Approximately 6 months
Higways
BAKU (AZERBAIJAN)
Project: BAKU (AZERBAIJAN)
Type of infrastructure: CONCRETE PAVEMENTS
Client: AKKORD CORP
Duration of assignment: Approximately 6 months
Formula 1 Race Tracks
ABU-DHABI (UAE)
Project: YAS MARINA F1 TRACK
Type of infrastructure: MAIN CONCRETE BUILDING
Client: TILKE CONSULTING ENGINEERS
Duration of assignment: Approximately 1 months
High rise buildings
DUBAI (UAE)
Project: BURJ 2020
Type of infrastructure: MEGA TOWER
Client: UNIMIX LLC
Duration of assignment: Approximately 1 months
DOHA (QATAR)
Project: Al BARWA
Type of infrastructure: REAL ESTATE
Client: AL WATANYIA CONCRETE
Duration of assignment: Approximately 1 months