Innovating with experience

International references

Tunneling

DUBAI (UAE)

Project: DEEP TUNNEL STORMWATER SYSTEM (DTSS)
Type of infrastructure: STORMWATER SYSTEM

Client: UNIMIX LLC / PORR – BESIX JV
Duration of assignment: Approximately 1 month

OSLO (NORWAY)

Project: FOLLO LINE PROJECT
Type of infrastructure: 37 km ROAD TUNNEL

Client: ACCIONA – GHELLA JV
Duration of assignment: Approximately 1 month

ISMAILIA / PORT SAID (EGYPT)

Project: ROAD TUNNELS UNDER THE SUEZ CANAL
Type of infrastructure: 5 km ROAD TUNNELS

Client: HERRENKNECHT, ORASCOM, PETROJET
Duration of assignment: Approximately 12 months

Bridges and viaducts

CEBU (PHILIPPINES)

Project: CEBU LINK EXPRESSWAY
Type of infrastructure: VIADUCT AND STAY CABLES BRIDGE

Client: ACCIONA INFRAESTRUCTURAS
Duration of assignment: Ongoing

FREDRIKSSUND (DENMARK)

Project: DUAL CARRIAGEWAY MARBÆKVEJ-SKIBBYVEJ
Type of infrastructure: VIADUCT

Client: BESIX-ACCIONA-RIZZANI DE ECCHER JV
Duration of assignment: Approximately 12 months

DUBAI (UAE)

Project: EXPOLINK 2020
Type of infrastructure: VIADUCTS

Client: ACCIONA-RIZZANI DE ECCHER JV
Duration of assignment: Approximately 12 months

CARTAGENA (COLOMBIA)

Project: VIADOTTO GRAN MANGLAR
Type of infrastructure: VIADUCT

Client: RIZZANI DE ECCHER
Duration of assignment: Approximately 12 months

Airports

TREVISO (ITALY)

Project: CANOVA INTERNATIONAL AIRPORT
Type of infrastructure: RUNWAYS

Client: CIVIL COURT OF TREVISO (ITALY)
Duration of assignment: Ongoing

DOHA (QATAR)

Project: AL SHAMAL MILITARY AIRPORT
Type of infrastructure: RUNWAYS / TAXIWAYS

Client: TCE ltd
Duration of assignment: 15 days

DOHA (QATAR)

Project: DOHA INTERNATIONAL AIRPORT
Type of infrastructure: TAXIWAYS

Client: QATAR AIRWAYS
Duration of assignment: Approximately 12 months

Engineering geology

ROGUN (TAJIKISTAN)

Project: ROGUN DAM HPP

Client: SALINI IMPREGILO
Duration of assignment: Approximately 12 months

MURMANSK (RUSSIA)

Project: ARTIC LNG2

Client: SAIPEM – SAREN
Duration of assignment: Approximately 3 months

Hydroelectric projects

ROGUN (TAJIKISTAN)

Project: ROGUN HPP
Type of infrastructure: RCC dam

Client: SALINI IMPREGILO
Duration of assignment: Approximately 3 months

ULU JELAI (MALAYSIA)

Project: ULU JELAI HYDROELECTRIC PROJECT
Type of infrastructure: GRAVITY DAM

Client: SALINI IMPREGILO
Duration of assignment: Approximately 3 months

Maritime structures

DUQM (OMAN)

Project: NEW LIQUID BERTH PROJECT
Type of infrastructure: BULK LIQUID GAS TERMINAL

Client: BESIX / BOSKALIS WESTMISTER
Duration of assignment: Approximately 6 months

Nuclear power plants

PORTISHEAD (ENGLAND)

Project: HINKLEY POINT C
Type of infrastructure: NEW NUCLEAR POWER PLANT

Client: EDF (Electricitè de France) / Balfour Beatty
Duration of assignment: Approximately 6 months

Higways

BAKU (AZERBAIJAN)

Project: BAKU (AZERBAIJAN)
Type of infrastructure: CONCRETE PAVEMENTS

Client: AKKORD CORP
Duration of assignment: Approximately 6 months

Formula 1 Race Tracks

ABU-DHABI (UAE)

Project: YAS MARINA F1 TRACK
Type of infrastructure: MAIN CONCRETE BUILDING

Client: TILKE CONSULTING ENGINEERS
Duration of assignment: Approximately 1 months

High rise buildings

DUBAI (UAE)

Project: BURJ 2020
Type of infrastructure: MEGA TOWER

Client: UNIMIX LLC
Duration of assignment: Approximately 1 months

DOHA (QATAR)

Project: Al BARWA
Type of infrastructure: REAL ESTATE

Client: AL WATANYIA CONCRETE
Duration of assignment: Approximately 1 months